NO.
|
Item
|
Qty
|
UNIT
|
Specification
|
|
Ⅰ、Living rabbit killing /bleeding and eviscerating unit
|
|
1
|
Killing & bleeding &eviscerating overhead convey line
خط الذبح والتدمية ونزع الأحشاء علوي
|
140
|
M
|
Which used to hanging and convey the rabbit for killing ,bleeding and eviscerating , the detail data as following :
1)-Material : stainless steel
|
|
2
|
Numbing machine
ماكينة التخدير
|
1
|
Set
|
Which used to numbing rabbit before killing , the detail data as following :
1)-Material : stainless steel
|
|
3
|
Blood collection trough
وحدة تجميع الدم
|
1
|
Set
|
Which used to collection the blood of the rabbit , the detail data as following :
1)-Material : stainless steel
|
|
4
|
Driving device
محرك الخط
|
2
|
Set
|
Which used to driving the overhead convey line , the detail data as following :
1)-Power : 2.2Kw
|
|
5
|
Tension device
وحدة تحكم
|
2
|
Set
|
Which used to tension the overhead convey line ,
|
|
6
|
Electric controlling box
|
1
|
Set
|
Which used to controlling the overhead convey line and some other electric equipment .
|
|
7
|
Washing device
ماكينة غسل الأرانب
|
1
|
Set
|
Which used to washing the rabbit after bleeding , the detail data as following :
1)-Material : Stainless steel
|
|
8
|
Fore-leg cutting machine
ماكينة تقطيع الأرجل الأمامية
|
1
|
Set
|
Which used to removing the fore leg of rabbit , the detail data as following:
1)-Material : stainless steel
|
|
9
|
Hind-leg cutting machine
ماكينة قطع الأرجل الخلفية
|
1
|
Set
|
Which used to removing the hind leg of rabbit , the detail data as following :
1)-Material : stainless steel
|
|
10
|
Skin de-hider
نزع الجلد
|
1
|
Set
|
Which used to hide the skin of rabbit, the detail data as following :
1)-Material : stainless steel
|
|
11
|
Direction Tension device
|
21
|
Set
|
Which used to tension and direction the over head convey with right direct .
|
|
12
|
Hook washing machine
ماكينة غسل الحامل
|
1
|
Set
|
Which used to washing the hooks , the detail data as following :
1)-Material : stainless steel
|
|
13
|
Viscera sliding trough
سير نقل الأحشاء
|
1
|
Set
|
Which used to slide viscera , the detail data as following :
1)-Material : stainless steel
|
|
Ⅱ、Pre-cooling unit
|
|
1
|
Pre-cooling Overhead conveying line
خط تبريد ما بعد الذبح العلوي
|
118
|
M
|
Which used to hanging and convey the rabbit carcass for pre-cooling , the detail data as following :
1)-Material : stainless steel
|
|
2
|
Driving device
وحدة التحكم
|
2
|
Set
|
Which used to driving the overhead convey line , the detail data as following :
1)-Power : 2.2Kw
|
|
3
|
Tension device
وحدة سحب الخط
|
2
|
Set
|
Which used to tension the overhead convey line
|
|
4
|
Direction Tension device
وحدة توجيه الخط
|
11
|
Set
|
Which used to tension and direction the over head convey with right direct.
|
|
5
|
Fluctuant bend rail
|
1
|
2
|
Which used to convey the over head convey line , the detail data as following :
1)-Material : stainless steel
|
|
6
|
Electric controlling box
صندوق المفاتيح
|
1
|
Set
|
Which used to controlling the overhead convey line and some other electric equipment.
|
|
Ⅲ、Installation Material
مواد التركيب
|
The complete rabbit slaughter equipment about need 15ton installation material.
|
|
Ⅳ、Transportation cost
تكلفة النقل
|
The complete 1000rbh slaughtering equipment about need one 40GP container.
|
|
Ⅴ、Installation and debugging cost
التركيب
|
The seller will appoint three well-skilled engineers go to direction installation and debugging , and the complete 1000rbh slaughtering equipment about need 25days for installation , the salary of the engineers calculation US$40 per body per day , so the total installation cost is : 25days*3bodys*US$40=3,000.00 US Dollar only
|